
Bathroom Remodeling in Old Evergreen Highway
Bathroom projects start From $8,000 plus sales tax
Free in-home visit · Fixed written price · 1-year workmanship warranty
A riverfront corridor along the Columbia in southeast Vancouver, with historic homes, Mount Hood views and a pioneer cemetery dating to 1850.
Old Evergreen Highway bathrooms
Evergreen Highway mixes eras more than any other area in this guide. Its largest tract has a 1995 median build year; the western tract it shares with Vancouver Heights is 1958, with 85% of homes built before 1980.
Riverfront and view homes along Evergreen Highway range from historic houses to newer custom builds, so a remodel can be a careful update of an older bathroom or a large primary suite designed around the view. Either way, the fan should be sized for the room.
Around Old Evergreen Highway
Near Henry J. Biddle Nature Preserve, East Biddle Lake Park, Fisher's Cemetery, and the Columbia River.
Old Evergreen Highway by the numbers
How old are the homes in Old Evergreen Highway?
The largest tract: median 1995, so an unremodeled bathroom is about 31 years old. Tract lines do not follow neighborhood lines, so read the table as the area around Old Evergreen Highway.
| Census tract (share of area) | Median year built | Built before 1980 | Built 2000+ | Owner-occupied |
|---|---|---|---|---|
| Tract 412.08 (42%) | 1995 | 28% | 38% | 55% |
| Tract 431 (20%) | 1958 | 85% | 8% | 78% |
| Tract 413.09 (15%) | 1979 | 53% | 1% | 54% |
What kind of homes Old Evergreen Highway has
Along Evergreen Highway, 69% of homes are detached and 22% are apartments, and 23% of residents are 65 or older. River-view houses here range from 1958-median streets to 1995-median custom builds, so a primary bath designed around a Columbia view is planned from the house itself, not a neighborhood type.
| Detached | Townhouse | 2–4 units | 5+ units | Mobile home | Age 65+ | Electric heat |
|---|---|---|---|---|---|---|
| 69% | 3% | 6% | 22% | 0% | 23% | 61% |
ACS units in structure (B25024) · ACS sex by age (B01001) · ACS house heating fuel (B25040)
- ZIP codes
- Mostly 98664 (part is 98683)
- School district
- Evergreen Public Schools (part is Vancouver)
- Water utility
- City of Vancouver (100% groundwater)
- Parks and natural areas
- Henry J. Biddle Nature Preserve · East Biddle Lake Park · Lieser Point natural area
- Distance
- About 5.5 miles (straight line) from downtown Vancouver
What the City of Vancouver says about Old Evergreen Highway
- The city describes a corridor along the Columbia River with historic homes, river and Mount Hood views and a rural character, and Fisher’s Cemetery, with a headstone dating to 1850.
- Concrete sections of Evergreen Highway carry date stamps back to 1918.
Sources: Census ACS 2020–24, year built by tract (B25034) · Census ACS 2020–24, median year built (B25035) · Census ACS 2020–24, tenure (B25003) · Clark County GIS boundaries (neighborhoods, tracts, ZIP, school and water districts) · Clark County GIS park land · City of Vancouver neighborhoods list. ACS estimates carry margins of error. Lead and asbestos rules.
Projects & published prices
What a bathroom project in Old Evergreen Highway costs
Published starting ranges, before the 8.9% sales tax that applies in Old Evergreen Highway.
| Project | Published range | With 8.9% tax |
|---|---|---|
| Small bathroom remodel | $15,000 – $28,000 | $16,340–$30,490 |
| Walk-in shower | $12,000 – $22,000 | $13,070–$23,960 |
| Tub-to-shower conversion | $8,000 – $15,000 | $8,710–$16,340 |
| Primary (master) bathroom | $28,000 – $60,000+ | $30,490–$65,340+ |
Links: Vancouver service pages. Accessible and curbless work is priced to scope (cost guides).
Permits & sales tax in Old Evergreen Highway
Inside Vancouver city limits: the residential building permit and electrical permits both come from the City of Vancouver Permit Center, (360) 487-7833. Sales tax 8.9% (rising to 9.0% on January 1, 2027). Read the Vancouver permit guide or everything about remodeling in Vancouver.
Rate source: Washington DOR. We pull and manage the permits.
Free estimate
Start your Old Evergreen Highway bathroom project
Tell us about your space and we'll follow up to schedule a free, no-obligation design consultation with clear, fixed pricing.
Prefer to talk? Call (360) 838-1340

Get Started Today
Ready to Transform Your Bathroom?
Let's create a space you'll love for years to come. Schedule a free consultation today.