Our Bathroom Remodeling Process

What happens from the first phone call to the finished room — who does what, how long it takes, and how to get your home ready.

  1. 1

    Free consultation & measurements

    We visit your home, look at the existing bathroom and talk through how you use it — who showers, who bathes, what bothers you about the room today.

    • Measurements and photos of the space
    • A look at ventilation, plumbing access and signs of past water damage
    • Your budget range and must-haves
  2. 2

    Design direction & fixed written price

    You get a written proposal with the scope, the main material selections and a fixed price for that scope. Nothing starts until you have read and accepted it.

    • Layout, tile, glass, fixtures and vanity selections
    • What is and is not included
    • Estimated schedule
  3. 3

    Permits & ordering

    Plumbing work usually needs a city or county permit, and electrical work needs a permit from L&I — or the City of Vancouver inside its limits. We pull and manage the permits and inspections required for the project, and order materials so they are on hand before demolition.

    • Permit from the city or county that covers your address
    • Material lead times confirmed before a start date is set
  4. 4

    Build

    Our crews handle the work from demolition through finish. The order of work below is typical for a full bathroom; a tub-to-shower conversion skips some steps.

    • Protection of floors and paths through the house
    • Daily clean-up of the work area
  5. 5

    Final walkthrough & warranty

    We go through every detail with you before the project is considered complete. Your remodel is backed by a 1-year workmanship warranty, on top of the manufacturer warranties on the materials we install.

    • Punch list walked together
    • Care instructions for tile, grout and glass

Inside the build: the order of work

A full bathroom remodel follows the same sequence almost every time. Knowing it helps you understand why some days look busy and others look quiet — inspections and curing time are part of doing it right.

  1. Step 1

    Demolition

    Fixtures, tile and drywall come out. This is when hidden water damage, if any, becomes visible.

  2. Step 2

    Rough plumbing & electrical

    Drains, supply lines, valves, wiring, lighting and the exhaust fan duct are set in the open walls.

  3. Step 3

    Rough-in inspection

    On permitted work, the inspector checks plumbing and electrical before walls are closed.

  4. Step 4

    Backer board & waterproofing

    Cement board or foam board goes up and a continuous waterproofing membrane is applied behind every wet area.

  5. Step 5

    Tile

    Floor and wall tile are set, then grouted and sealed where the material calls for it.

  6. Step 6

    Fixtures, vanity & glass

    Valve trim, toilet, vanity, top and lighting go in. Custom glass is measured after tile and installed last.

  7. Step 7

    Final inspection & walkthrough

    The permit is closed out, and we walk the finished room with you.

How long it takes

Typical time on site once work begins. Material lead times and permit review happen before the start date and are confirmed in your proposal.

ProjectTypical time on site
Tub-to-shower conversion1–2 weeks
Walk-in shower1–2 weeks
Full guest or hall bathroom3–5 weeks
Primary (master) bathroom3–5 weeks

Getting your home ready

  • Plan which bathroom everyone will use while this one is out of service.
  • Clear the room and the path to it — counters, cabinets, wall hangings.
  • Expect the water to be shut off for short periods during plumbing work.
  • Keep pets and children away from the work area while crews are on site.
  • Decide on selections early. Late changes are the most common cause of delays.

Before you hire anyone in Washington

These checks apply to every contractor you talk to, including us.

  • Check the contractor’s L&I registration

    Washington requires every construction contractor to register with the Department of Labor & Industries, which includes a bond and liability insurance. L&I’s free lookup shows a contractor’s registration status, bond and insurance.

    Verify a contractor at L&I →
  • Expect a “Notice to Customer” on jobs of $1,000 or more

    State law (RCW 18.27.114) requires the contractor to give you this disclosure, and have you sign it, before starting work on a job of $1,000 or more. It lists the contractor’s registration number and bond, and explains retainage and how suppliers or subcontractors could lien your property.

    Read RCW 18.27.114 →
  • Know who pulls the permit

    Permits are issued by the city or county that covers your address. Agree in writing who applies for the permit and schedules inspections before work begins.

    Clark County residential permits →

Ready to compare? See our published price ranges and warranty.

Free Estimate

Ready to start your bathroom?

Tell us a little about your project. Here's what happens next:

  1. 1

    We call you back

    Within one business day (Mon–Fri, 7:00 AM – 6:00 PM).

  2. 2

    Free in-home visit

    We measure, talk through ideas, and answer questions. No obligation.

  3. 3

    Fixed written price

    A clear proposal with scope, materials, and timeline.

Ben B., Camas Bath project managerRuss S., Camas Bath project managerGeorge S., Camas Bath project manager

Ben, Russ or George calls you back — they're our project managers.

Prefer to talk? Call (360) 838-1340

Free estimate · Step 1 of 2

What are you planning?
When would you like to start?

Takes about 30 seconds. Or call (360) 838-1340.