Our Bathroom Remodeling Process
What happens from the first phone call to the finished room — who does what, how long it takes, and how to get your home ready.
- 1
Free consultation & measurements
We visit your home, look at the existing bathroom and talk through how you use it — who showers, who bathes, what bothers you about the room today.
- Measurements and photos of the space
- A look at ventilation, plumbing access and signs of past water damage
- Your budget range and must-haves
- 2
Design direction & fixed written price
You get a written proposal with the scope, the main material selections and a fixed price for that scope. Nothing starts until you have read and accepted it.
- Layout, tile, glass, fixtures and vanity selections
- What is and is not included
- Estimated schedule
- 3
Permits & ordering
Plumbing work usually needs a city or county permit, and electrical work needs a permit from L&I — or the City of Vancouver inside its limits. We pull and manage the permits and inspections required for the project, and order materials so they are on hand before demolition.
- Permit from the city or county that covers your address
- Material lead times confirmed before a start date is set
- 4
Build
Our crews handle the work from demolition through finish. The order of work below is typical for a full bathroom; a tub-to-shower conversion skips some steps.
- Protection of floors and paths through the house
- Daily clean-up of the work area
- 5
Final walkthrough & warranty
We go through every detail with you before the project is considered complete. Your remodel is backed by a 1-year workmanship warranty, on top of the manufacturer warranties on the materials we install.
- Punch list walked together
- Care instructions for tile, grout and glass
Inside the build: the order of work
A full bathroom remodel follows the same sequence almost every time. Knowing it helps you understand why some days look busy and others look quiet — inspections and curing time are part of doing it right.
Step 1
Demolition
Fixtures, tile and drywall come out. This is when hidden water damage, if any, becomes visible.
Step 2
Rough plumbing & electrical
Drains, supply lines, valves, wiring, lighting and the exhaust fan duct are set in the open walls.
Step 3
Rough-in inspection
On permitted work, the inspector checks plumbing and electrical before walls are closed.
Step 4
Backer board & waterproofing
Cement board or foam board goes up and a continuous waterproofing membrane is applied behind every wet area.
Step 5
Tile
Floor and wall tile are set, then grouted and sealed where the material calls for it.
Step 6
Fixtures, vanity & glass
Valve trim, toilet, vanity, top and lighting go in. Custom glass is measured after tile and installed last.
Step 7
Final inspection & walkthrough
The permit is closed out, and we walk the finished room with you.
How long it takes
Typical time on site once work begins. Material lead times and permit review happen before the start date and are confirmed in your proposal.
| Project | Typical time on site |
|---|---|
| Tub-to-shower conversion | 1–2 weeks |
| Walk-in shower | 1–2 weeks |
| Full guest or hall bathroom | 3–5 weeks |
| Primary (master) bathroom | 3–5 weeks |
Getting your home ready
- Plan which bathroom everyone will use while this one is out of service.
- Clear the room and the path to it — counters, cabinets, wall hangings.
- Expect the water to be shut off for short periods during plumbing work.
- Keep pets and children away from the work area while crews are on site.
- Decide on selections early. Late changes are the most common cause of delays.
Before you hire anyone in Washington
These checks apply to every contractor you talk to, including us.
Check the contractor’s L&I registration
Washington requires every construction contractor to register with the Department of Labor & Industries, which includes a bond and liability insurance. L&I’s free lookup shows a contractor’s registration status, bond and insurance.
Verify a contractor at L&I →Expect a “Notice to Customer” on jobs of $1,000 or more
State law (RCW 18.27.114) requires the contractor to give you this disclosure, and have you sign it, before starting work on a job of $1,000 or more. It lists the contractor’s registration number and bond, and explains retainage and how suppliers or subcontractors could lien your property.
Read RCW 18.27.114 →Know who pulls the permit
Permits are issued by the city or county that covers your address. Agree in writing who applies for the permit and schedules inspections before work begins.
Clark County residential permits →
Ready to compare? See our published price ranges and warranty.

Free Estimate
Ready to start your bathroom?
Tell us a little about your project. Here's what happens next:
- 1
We call you back
Within one business day (Mon–Fri, 7:00 AM – 6:00 PM).
- 2
Free in-home visit
We measure, talk through ideas, and answer questions. No obligation.
- 3
Fixed written price
A clear proposal with scope, materials, and timeline.



Ben, Russ or George calls you back — they're our project managers.
Prefer to talk? Call (360) 838-1340