Updated · 7 min read
By Camas Bath
The short answer
To compare bathroom remodel quotes, put them side by side on the same scope: demolition depth, waterproofing system, fixtures and tile, ventilation, permits, sales tax as a separate line, payment schedule and change-order terms. In Washington, also confirm each contractor’s registration with L&I’s free Verify tool, expect a signed Notice to Customer on jobs of $1,000 or more (RCW 18.27.114), and get lien releases as you pay.
Bathroom quotes are hard to compare because each contractor describes the job differently. One lists every item; another gives a single number with “remodel bathroom” underneath. The gap between them is usually not price — it is scope: what gets torn out, what goes behind the tile, what is included and what is left as an allowance.
This checklist walks through a quote in the order the work happens, with the Washington-specific items that national checklists miss.
Key facts
- In Washington, a contractor must give the customer a signed disclosure statement before starting residential work priced at $1,000 or more, keep a copy for 3 years, and cannot claim a lien on that contract without proving it was given (RCW 18.27.114).
- Washington sales tax must be stated separately from the selling price on any invoice or contract (RCW 82.08.050(9)(a)).
- Washington’s residential code requires a bathroom exhaust fan of at least 50 cfm intermittent or 20 cfm continuous, ducted directly outside (WAC 51-51-1505).
- Under RCW 18.27.110, no Washington city, town or county may issue a building permit for registered-contractor work without first verifying the registration, and the number is printed on the permit (RCW 18.27.110).
Key takeaways
- Compare scope first: demolition depth, layout changes and how hidden damage is handled.
- A quote should name the waterproofing method and the fan, not just the tile.
- Raise every allowance to what you will actually choose before comparing totals.
- In Washington, sales tax applies to the whole contract and must be stated separately.
- Verify L&I registration and collect lien releases as you pay.
1. Are they quoting the same bathroom?
- Demolition: to the studs in the wet area, or a surface replacement? Only the first lets anyone see — and fix — damage behind the walls.
- Layout: does the toilet, shower drain or vanity move? Moving a drain is one of the largest single cost items.
- Repairs: how is rotted framing or subfloor handled if it is found? Look for a stated method or price, not silence.
- Removal and disposal, protection of floors outside the bathroom, and final cleaning: included or extra?
2. What is behind the tile, and is it in the quote?
This is where cheaper quotes usually differ. Tile and grout are not waterproof; the membrane behind them is. A quote should name the waterproofing method for the shower walls and floor, and say the pan will be sloped and flood-tested before tile. See the shower waterproofing guide and the ANSI A118.10 standard explained.
Ventilation belongs here too. Washington’s code minimum for a bathroom fan is 50 CFM intermittent (WAC 51-51-1505); a quote should say what fan is going in and that it is ducted outside. See bathroom fan sizing.
3. Does the quote name products or use allowances?
An allowance is a placeholder budget — for example, a set amount for tile — that you spend when you choose the real product. If what you choose costs more, you pay the difference. Two quotes with very different allowances are not comparable until you raise the low ones to what you actually expect to pick.
Named products (a specific valve, vanity or glass thickness) remove that uncertainty. Either is fine; what matters is knowing which you are looking at.
A quick test
Ask each contractor: “If I choose the tile and fixtures I showed you, what is the total?” The answers are more comparable than the original quotes.
4. Which code items should a bathroom quote cover?
- A pressure-balance or thermostatic shower valve — required for every shower in Washington’s plumbing code (UPC 408.3).
- GFCI protection and a 20-amp circuit for bathroom outlets (NEC 210.8, 210.11).
- Lead-safe work practices if the home was built before 1978, and asbestos testing where suspect materials are disturbed.
- Details: Washington bathroom code requirements.
5. Permits, sales tax and the real total
- Who pulls the permits? It should be the contractor, under their own registration. Permit offices must verify that registration before issuing (RCW 18.27.110). See the Clark County permit guide.
- Is sales tax included or added? In Washington it applies to the whole contract — labor and materials — at the rate for your address (WAC 458-20-170), and must be stated separately (RCW 82.08.050). On a $20,000 remodel, each percentage point is $200. See sales tax on a bathroom remodel.
- Compare totals after tax and after raising allowances to your real choices.
6. Payments, changes and lien releases
- A payment schedule tied to milestones, never the full amount up front.
- How change orders are priced and approved — in writing, before the work.
- Lien releases as each phase is paid. Under Washington’s lien law (RCW 60.04), unpaid subcontractors and suppliers can claim a lien; on a remodel of an owner-occupied home, a lien from someone you did not hire directly can be satisfied only from what you had not yet paid your contractor when their Notice to Owner arrived.
- Registration, bond and insurance: verify each contractor for free with L&I’s Verify tool before signing. A signed disclosure statement is required on residential jobs of $1,000 or more (RCW 18.27.114). See choosing a bathroom remodeler.
A side-by-side table you can use
| Line | What to write down |
|---|---|
| Demolition depth | Studs in wet area / surface only |
| Damage repair | Method or unit price / not stated |
| Waterproofing | Product or method named / not stated |
| Flood test before tile | Yes / no |
| Exhaust fan | CFM and ducted outside / not stated |
| Tile, vanity, fixtures | Named products / allowance amounts |
| Permits | Contractor pulls / homeowner / not stated |
| Sales tax | Separate line / included / not mentioned |
| Payment schedule | Milestones / large deposit |
| Warranty | Length and what it covers, in writing |
How Camas Bath quotes
After a free in-home visit you get one fixed written price that names the waterproofing, the fan and the products or allowances, with permits included and sales tax on its own line, plus a 1-year workmanship warranty in writing. You are welcome to put it next to any other quote using the table above. Request a free estimate.
Frequently asked questions
- Why are bathroom remodel quotes so different?
- Bathroom remodel quotes differ mostly because they cover different work: one may replace surfaces while another rebuilds to the studs with a new waterproofing membrane, or one uses low allowances that rise once you choose real products. Line the quotes up item by item before comparing the totals.
- Should a bathroom remodel quote include sales tax in Washington?
- Washington sales tax applies to the full remodeling contract, labor included, at the rate for the job address, and it must be stated separately. Ask each contractor whether their bathroom quote includes it.
- What is an allowance in a remodeling quote?
- An allowance in a remodeling quote is a placeholder budget for an item you have not chosen yet, such as tile or a vanity. If the product you choose costs more than the allowance, the difference is added to your price.
Sources
- RCW 18.27 — Registration of contractors
- RCW 18.27.114 — Disclosure statement required
- WAC 51-51-1505 — Mechanical ventilation (bathroom exhaust)
- RCW 18.27.110 — Building permits: verification of registration
- RCW 60.04 — Mechanics’ and materialmen’s liens
- WAC 458-20-170 — Constructing and repairing buildings (sales tax)
- RCW 82.08.050 — Sales tax to be stated separately
- Washington L&I — Verify a contractor
- Washington Attorney General — Home improvement scams
- WAC 51-56-0400 — Washington amendments to UPC chapter 4
Claims and figures are drawn from the sources above and provided for general guidance; your project may vary. For a fixed price on your specific bathroom, request a free estimate.